first_imgSeptember 12, 2000Construction manager Toni Fragiacomo and September workshopperLinda Roby fill the concrete mixer getting the material ready for today’s pour.Photo by: Doctress Neutopia Arcosanti workshoppers,Gail and John Wolcrott, help to screed the concrete within the wooden framefor the silt cast panel. Photo by: DoctressNeutopia At the end of the working day, the constructioncrew, poses for a photograph beside the finished silt panel. The panel willbe set into place as a key panel after the proper curing time for a least threeweeks. Photo by: DoctressNeutopiacenter_img Stephen Cote and Ray Shong work spreading out the concrete for the pre-castsilt panel for theEast Crescent Complex Phase Five. Photo by: DoctressNeutopialast_img

Tags: , , , , , , , , ,

Leave a Reply